Xinjie Intelligent Control (Hangzhou)XINJIE INTELLIGENT CONTROL · HANGZHOU

HomeProject CasesApartment LoRa Smart-Meter Retrofit

Apartment LoRa Smart-Meter Retrofit

IoT & Wireless · Meter RetrofitDelivered

Apartment LoRa Smart-Meter Retrofit

A retrofit that never touches the original meters: our node board takes power and data from the meter's two-wire bus and uplinks over LoRa to a unit gateway — tenants check and pay bills on their phones while operators read meters remotely and cut/restore power automatically on arrears.

01 / PROJECT OVERVIEW

Project Overview

01

Original Meter Untouched

02

Two-Wire Power & Data

03

SX1262 LoRa Uplink

04

2.7% Measured Packet Loss

05

Arrears Cut / Payment Restore

06

18 Floors x 126 Meters Deployed

Electricity collection in apartments is a labor black hole: every month someone reads meters door by door, then keys the numbers in, then waits for offline payments, then phones around for arrears. Meters sit in electrical shafts — several hundred units take most of a day, and the data is inherently a month stale.

03 / OUR ENGINEERING

Our Engineering

The first hurdle of a retrofit is not communications but power. There is no socket in the shaft; pulling a 220 V line means trays and approvals — bringing back exactly the retrofit cost we just ruled out; batteries mean climbing into 126 shafts to swap cells. We pushed the power path back to the meter side: onboard M-BUS/POWER two-wire terminals draw power directly from the meter bus, adding zero new wires. An MP2307 synchronous buck steps the bus voltage down, then a BL807 LDO stabilizes the controller and radio rails — voltage differences across meter batches are absorbed here instead of becoming field problems.

05 / DELIVERY

Delivery Results

Delivery Status

Delivered

Delivered · field retrofit complete

Conclusion

Deployed on site: one 18-floor apartment building with 126 meter positions, two-wire power take-off, LoRa uplink and a closed billing-plus-valve-control loop. Meter reading moved from door-to-door labor to automatic console reads; arrears handling moved from phone calls to automatic power cut and restore on payment.

Engineering first, quote later

Need a similar project?

Describe the scenario and delivery requirements — an engineer will assess feasibility and timeline directly.