Xinjie Intelligent Control (Hangzhou)XINJIE INTELLIGENT CONTROL · HANGZHOU

HomeProject CasesRail-Mounted Six-Axis Attitude Inspection Cart

Rail-Mounted Six-Axis Attitude Inspection Cart

Industrial Control & Automation · STM32Delivered

Rail-Mounted Six-Axis Attitude Inspection Cart

An automated inspection cart for track geometry surveys in mines and tunnels: a six-axis IMU and incremental encoder sample synchronously by distance — one person pushes it along once and gets per-meter roll, pitch, heading and mileage, with data logged and readable on a phone.

01 / PROJECT OVERVIEW

Project Overview

01

Six-Axis Attitude Fusion

02

Mileage-Synced Sampling

03

Equal-Distance Trigger

04

Data Survives Power Loss

05

Direct Phone-Web Readout

06

Single-Rail Straddle Structure

Track geometry is the base data of line maintenance — longitudinal level, cross level (cant) and alignment decide whether trains ride smoothly and whether wheel-rail wear stays even. The traditional method: a two-person crew, one pressing a gauge against the rail point by point and reading, one recording. Nearly a thousand measurement points per kilometer, a few hundred meters per shift, all read, called out and transcribed by hand; back at the office the paper numbers are typed into spreadsheets, and misreads, omissions and inconsistent conventions can never be re-checked.

03 / OUR ENGINEERING

Our Engineering

Instead of a generic rail-cart chassis, the whole machine is redesigned around "one rail as the datum": the body straddles the reference rail, two wheel sets ride the railhead for load, and lateral guide wheels clamp both sides of the railhead to lock the transverse position — body attitude is mechanically bound to the actual rail geometry, which is what makes the measured angles meaningful. At the rear, a high-friction measuring wheel presses on the railhead with its shaft directly driving an incremental encoder: sampling is triggered by true rolled distance, not by a timer.

05 / DELIVERY

Delivery Results

Delivery Status

Delivered

Delivered · field-deployed underground

Conclusion

Delivered as a single-person-portable unit plus a fixed data convention. One push replaces a two-person gauge crew; measurement changes from "spot checks" to "continuous coverage". Two runs over the same section land on the same mileage coordinates and can be subtracted directly — showing the track's change over time instead of two unrelated records. The cart has completed field measurement on multiple underground track sections, from data capture to report generation entirely on a phone.

Engineering first, quote later

Need a similar project?

Describe the scenario and delivery requirements — an engineer will assess feasibility and timeline directly.